About the Project

Located in close proximity to the sea in order to provide residents with magnificent views, this tower is a sought-after property. But due to varying temperatures and the salty environment, the ceilings started to spall and in some areas, exposed the rebar.

Using MAXON products such as MAXON C2M, MAXON CP, and MAXON HW, not only was a superior water barrier formed, any salt existing within the structure was expelled, the concrete hardened and was fortified. The ceilings are now able to withstand corrosion and remain for a longer period of time.

View Our Results

This job was executed without sandblasting or grinding.